Soitec Solar Development, PDS2012-3910-120005 (ER); Rugged Solar, PDS2012-3300-12-007 (MUP); Tierra Del Sol Solar, PDS2012-3600-12-005 (REZ), PDS2012-3921-77-04
3 Documents in Project
Summary
SCH Number
2012121018
Lead Agency
San Diego County
Document Title
Soitec Solar Development, PDS2012-3910-120005 (ER); Rugged Solar, PDS2012-3300-12-007 (MUP); Tierra Del Sol Solar, PDS2012-3600-12-005 (REZ), PDS2012-3921-77-04
Document Type
NOD - Notice of Determination
Received
Posted
11/16/2015
Present Land Use
A70, Limited Agricultural, A72, General Agricultural, S92, General Rural/Rural Lands 80 (RL-80)
Document Description
The project includes two concentrated photovoltaic projects on two project sites totaling 420 and 765 acres. The Rugged project requires a major use permit. The Tierra Del Sol project requires a MUP, a Rezone to remove an "A" designator and a resolution disestablishing an agricultural preserve.
Contact Information
Name
Ashley Smith
Agency Name
County of San Diego
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
McCain Valley Road and Old Hwy 80
Zip
91905
Total Acres
1473
Parcel #
numerous
State Highways
Old Hwy 80, I-8, Hwy 94
Railways
San Diego and Arizona Eastern
Airports
No
Schools
Clover Flat Elementary
Waterways
Tule Lake/Creek and Walker Canyon
Township
17/18S
Range
6/7E
Section
8,9,15
Base
SBB&M
Other Location Info
Boulevard
Notice of Determination
Approving Agency
San Diego County
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.