Parcel Merger and Expansion of Athletic Fields with a New Track and Artificial Turf Infill

2 Documents in Project

Summary

SCH Number
2012112047
Lead Agency
City of Portola Valley
Document Title
Parcel Merger and Expansion of Athletic Fields with a New Track and Artificial Turf Infill
Document Type
NOD - Notice of Determination
Received
Posted
3/25/2013
Present Land Use
Institution/R-E/1a/SD-1a(Residential Estate/Slope Density/1 acre)
Document Description
An Amendment to Conditional use Permit (CUP #X7D-3), parcel merger, and expansion of athletic fields with new track and synthetic turf infield. The expansion of athletic fields would include removal of a portion of the existing natural turf area, and replacing that same area with a synthetic track surface with a synthetic turf infield. Secondary improvements include an asphalt driveway, removal of existing volleyball facilities, construction of necessary subsurface drainage improvements, restoration of native landscaping and trail improvements, earthwork, and sewer pipeline relocation. Earthwork will include removal and re-contouring of an existing berm, with the cut material used onsite as raised fill under the track and field area. Cut and fill material is proposed to balance on site.

Contact Information

Name
Nick Pegueros
Agency Name
City of Portola Valley
Contact Types
Lead/Public Agency

Location

Cities
Portola Valley
Counties
San Mateo
Cross Streets
Portola Road
Zip
94028
Total Acres
4
Parcel #
079-053-130, -140, -050, 079-220-040
Schools
Omandale Elem
Waterways
Corte Madera Creek

Notice of Determination

Approving Agency
Town of Portola Valley
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print