Truckee River Legacy Trail Phase 3B
4 Documents in Project
Summary
SCH Number
2012111094
Lead Agency
City of Truckee
Document Title
Truckee River Legacy Trail Phase 3B
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2013
Present Land Use
Public Facility/Public
Document Description
Note: Reference SCH# 2009092044
The Town of Truckee is proposing to construct 2.11 miles of Class I (paved, multi-use) trail along the Truckee River. For most of its length, the trail will consist of a 10-foot wide asphalt concrete paved trail with 2-foot wide aggregate base shoulders on either side. The Truckee River Legacy Trail Phase 3B consists of a trail extension beginning at the easterly end of the recently completed Phase 3A segment and follows along the south bank of the Truckee River past the Tahoe-Truckee Sanitation Agency Wastewater Treatment Plant, spans Martis Creek, and then ascends to a connection to Glenshire Drive. The trail will cross Martis Creek upstream of its confluence with the Truckee River. This crossing will consist of a prefabricated steel bridge. A portion of the trail (approximately 240 feet) will be constructed within the 100-year floodplain of the Truckee River.
Contact Information
Name
Becky Bucar
Agency Name
City of Truckee
Contact Types
Lead/Public Agency
Phone
Location
Cities
Truckee
Counties
Nevada
Zip
96161
Parcel #
49-330-04, 05 49-011-06, 25, 28, 29
State Highways
Hwy 89
Railways
UPRR
Airports
Truckee-Tahoe
Schools
Glenshire ES
Waterways
Truckee River, Martis Creek, Martis Creek Reservoir
Notice of Determination
Approving Agency
Town of Truckee
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes