PCCR USA, Inc. Interim Measures; U.S. EPA ID. NO. CAD076180843
3 Documents in Project
Summary
SCH Number
2012111092
Lead Agency
Department of Toxic Substances Control
Document Title
PCCR USA, Inc. Interim Measures; U.S. EPA ID. NO. CAD076180843
Document Type
NOD - Notice of Determination
Received
Posted
2/12/2013
Present Land Use
Manufacturing
Document Description
The DTSC, pursuant the authority granted under Chapter 6.5 of the Health and Safety Code has approved an Interim Measure (IM) project to remediate contamination in in vadose zone soils currently impacting groundwater at the PCCR Inc. Lynwood facility (Site). Corrective action began at the site in 1989. Groundwater and soil vapor extraction systems were installed by 2003. In 2008, DTSC requested additional soil and groundwater investigation to re-evaluate current conditions at the Site. The soil investigation was completed n 2009, and the offsite groundwater investigation was completed in 2010.
Contact Information
Name
Peter Ruttan
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Lynwood
Counties
Los Angeles
Cross Streets
Franklin St. & Lynwood Road
Zip
90262
Total Acres
4.5
Parcel #
6169-010-003
State Highways
I-105
Railways
UPRR
Schools
Lincoln and Mona Park
Waterways
LA-Aquaduct
Township
3S
Range
3W
Section
10
Base
SBB&M
Notice of Determination
Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.