San Diego Creek Between I-405 and I-405 Sand Removal project (Streambed Alteration Agreement No. 1600-2017-0054-R5)

7 Documents in Project

Summary

SCH Number
2012111011
Lead Agency
Orange County
Document Title
San Diego Creek Between I-405 and I-405 Sand Removal project (Streambed Alteration Agreement No. 1600-2017-0054-R5)
Document Type
NOD - Notice of Determination
Received
Posted
8/4/2017
Present Land Use
County Flood Control/Transportation Use
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2017-0054-R5, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Orange County Public Works. Project is limited to removing sediment from San Diego Creek between I-40 and I-405. The project will re-establish the stream to as-built conditions. Excavators, bulldozers, backhoes, scrapers, loaders, and other earth moving equipment will remove an estimated 530,000 cubic yards of sediment from 6.2 miles of San Diego Creek within the project area. The project will impact a maximum of 138.71 acres of stream channel. The majority of the impact area is unvegetated due to existing structures, channel scouring, sedimentation, and ongoing vegetation removal maintenance activities. Sparse areas of native and non-native vegetation temporarily establish in this reach of San Diego Creek between scour/sedimentation episodes and ongoing maintenance activities.

Contact Information

Name
Kevin Hupf
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Cities
Irvine, Santa Ana
Counties
Orange
Regions
Countywide
State Highways
Multiple
Railways
Multiple
Airports
Multiple
Schools
Multiple
Waterways
Multiple
Township
5S
Range
9W
Base
SBB&M

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print