Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station
6 Documents in Project
Summary
SCH Number
2012101011
Lead Agency
Coachella Valley Water District
Document Title
Highway 86 Domestic Water Transmission Main Phase 2 and Pump Station
Document Type
NOD - Notice of Determination
Received
Posted
11/19/2012
Present Land Use
"Agricultural", "Commercial/Retail", "Medium Density Residential", "Rural Residential", and "Areas Subject to Indian Jurisdiction"
Document Description
Note: Reference SCH # 2009041034
The proposed 30-inch-diameter pipeline is approximately 7.2 miles long and will connect to an existing 30-inch-diameter pipeline located on the west side of Highway 86 at Avenue 74. From Avenue 74 south to Avenue 81, the pipeline will be aligned approximately 35 feet from existing centerline within the roadway right-of-way. Approaching Avenue 82, the proposed pipe will be located 110 feet from the centerline (ten feet west of the existing roadway right-of-way). Just north of Avenue 84, the pipeline swings southwesterly around Caltrans' future interchange right-of-way and turns southeasterly returning to the previous described alignment of 10 feet west of Highway 86S right-of-way. At Avenue 86, the pipeline connects to an existing 16-inch diameter pipeline that currently supplies ID 11 with groundwater from a small well field located west of the project along Avenue 86.
Contact Information
Name
Jim Barret
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency
Phone
Location
Counties
Riverside
Cross Streets
Avenue 80/Highway 86
Zip
92274
Total Acres
2
Parcel #
various
State Highways
Hwy 86, 86S, 195
Waterways
Salton Sea
Township
8S
Range
8E
Section
13
Base
SBB&M
Other Location Info
City/Nearest Community: Oasis
Notice of Determination
Approving Agency
Board of Directors of the Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.