Troutdale Creek Bridge Replacement Project

7 Documents in Project

Summary

SCH Number
2012092011
Lead Agency
California Department of Transportation, District 4
Document Title
Troutdale Creek Bridge Replacement Project
Document Type
FIN - Final Document
Received
Present Land Use
Conventional State Highway
Document Description
Caltrans proposes to remove the existing 31-foot wide, 26-feet long, two-lane, single-span Troutdale Creek Bridge (Bridge # 21-0004) and replace it with a 51-feet wide, 60-feet long, two-lane, single-span bridge. The proposed single span bridge would be built on a new alignment of Route 29, southeast of the existing bridge. The proposed bridge will be built on a new curve alignment with a radius of 165 feet across the creek, which is larger than the existing radius of 110 feet. The proposed roadway section will consist of two 16-feet lanes with standards 8-feet shoulders that will conform to the existing two 12-feet lanes with non-standard 2-feet shoulders. The project will not increase roadway capacity.

Contact Information

Name
Yolanda Rivas
Agency Name
California Department of Transportation, District 4
Contact Types
Lead/Public Agency

Location

Cities
Calistoga
Counties
Napa
Cross Streets
SR 29 at Troutdale Creek
Zip
94515

Notice of Completion

Development Types
Transportation:Other (Bridge Replacement)
Project Issues
Biological Resources, Cultural Resources, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print