Replacement Culvert

3 Documents in Project

Summary

SCH Number
2012082072
Lead Agency
San Mateo County
Document Title
Replacement Culvert
Document Type
NOD - Notice of Determination
Received
Posted
7/18/2013
Present Land Use
Agricultural/Planned Agricultural District/Agriculture
Document Description
The Project includes the replacement of an existing culvert with a 3-foot diameter 16-foot long concrete culvert to provide access to the property. Concrete wing walls, sized so that fill slopes are no greater than 2:1 (H: V) from the road edge to the wing wall, will be constructed on the upstream and downstream ends of the culvert. Ten cubic yards of soil material will be removed around the existing culvert and 18 cubic yards of fill will be used to replace the cut. The backfill will be compacted at least 95% of relative density and the upper 12 inches of new road surfaces will consist of Class 2 base rock. All project construction work will be completed during the summer months when the stream channel is dry. CDFW is executing a Lake and Streambed Alteration Agreement, Number 1600-2013-0096-R3, pursuant to Section 1602 of the Fish and Game Code to the project Permittee, Burke Land Use.

Contact Information

Name
Suzanne DeLeon
Agency Name
California Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Location

Counties
San Mateo
Cross Streets
Pescadero Creek Road
Total Acres
65.15
Parcel #
087-150-140
State Highways
Hwy 1
Schools
Pescadero ES
Waterways
Bradley Creek, Butano Creek, Pescadero Creek, Honsing
Other Location Info
City/Nearest Community: Pescadero

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A