Live Oak Soccer Park and Stormwater Detention Facility

4 Documents in Project

Summary

SCH Number
2012082001
Lead Agency
City of Live Oak
Document Title
Live Oak Soccer Park and Stormwater Detention Facility
Document Type
NOD - Notice of Determination
Received
Posted
1/12/2015
Present Land Use
Graded undeveloped land / Civic / Park
Document Description
A Supplemental Initial Study/Mitigated Negative Declaration was prepared for the project and circulated to the general public and to public agencies for review and comment from Oct. 23, 2014 to Nov. 22, 2014. The proposed project elements not previously analyzed in the City's adopted IS/MND or the EIS/EIR prepared and adopted by the Sutter Butte Flood Control Agency (SBFCA) include a stormwater outfall drain into Reclamation District 777's Lateral Drain Number 2 (channel); a 3-foot deep saddle for surface water overflow into the channel; and a slope reduction of the channel on the western property line of the project site. In addition, the well and utility area are proposed to be moved from the end of Linda Street in the northeast corner of the project site, as it was determined to be infeasible to connect a three-phase electrical system at the previously analyzed location. As a result, the well and utility area will be located near the southwest corner of the project site.

Contact Information

Name
Angela Spain
Agency Name
City of Live Oak
Contact Types
Lead/Public Agency

Location

Cities
Live Oak
Counties
Sutter
Cross Streets
Ida St & Linda St.
Zip
95953
Total Acres
26
Parcel #
09-25-23
State Highways
Hwy 99
Railways
UPRR
Airports
Bowles
Schools
Live Oak Unified School
Waterways
Feather River
Township
16N
Range
3E
Section
5
Base
MDB&M

Notice of Determination

Approving Agency
City of Live Oak City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print