SR 25 Curve Correction (Project); (California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-010-04 (ITP), Amendment No. 1)
8 Documents in Project
Summary
SCH Number
2012071077
Lead Agency
California Department of Transportation, District 5
Document Title
SR 25 Curve Correction (Project); (California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2014-010-04 (ITP), Amendment No. 1)
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2015
Present Land Use
Surrounding land use: pasture, residential. Zoning: agriculture
Document Description
The Project involves realigning the 0.4 mile section of SR 25 to current design standards by replacing the nonstandard curve with a 2,000 foot radius curve. This will require cutting into the hillside to a maximum depth of 44 feet. The new section of SR 25 would be 900 feet long and 40 feet wide, including a rock catchment area on either side at the base of the slopes which would be 0.25:1 or flatter. In addition to the new section of road, two new driveways exits will be installed as well as access to a stockpile area. The remaining 24,790 square feet (0.569 acres) of the previous alignment will be rehabilitated to allow for revegetation with oak trees. The Project will result in the permanent development of 1.86 acres of upland habitat and temporary impacts to 0.87 acres of upland habitat resulting in a total habitat disturbance of 2.73 acres. Amendment No. 1 referenced above as issued by CDFW authorizes a change in Condition of Approval 7.5 that allows the use of small scale construction equipment during Covered Species burrow excavation.
Contact Information
Name
Laura Peterson-Diaz
Agency Name
CDFW Central Region
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Benito
Zip
95043
Parcel #
adjacent to 028-160-023
State Highways
Hwy 25
Railways
No
Airports
No
Schools
No
Waterways
San Benito River
Other Location Info
City/Nearest Community: Paicines
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No