Merrill Residence Halls Capital Renewal

4 Documents in Project

Summary

SCH Number
2012062017
Lead Agency
University of California
Document Title
Merrill Residence Halls Capital Renewal
Document Type
NOD - Notice of Determination
Received
Posted
11/20/2013
Present Land Use
Colleges and Student Housing (under UC Santa Cruz 2005 Long Range Development Plan)
Document Description
On December January 3, 2013, the University adopted the Mitigated Negative Declaration and the Initial Study prepared for the proposed Merrill Capital Renewal Project and approved the Project. The Project, as described in the Initial Study and approved in January 2013, consisted of major maintenance and renovation of four student residence halls and the Guzman Suites student apartment building; improvements to the pedestrian circulation system and outdoor gathering spaces with Merrill College; and replacement of two small buildings with a new building of approximately 4,609 sf. The Project, as approved in January 2013, would add approximately 60 additional student bed spaces through reconfiguration of existing space and enclosure of existing stairwells and roof decks. The Project design has now been modified to include the demolition of the Guzman Suites apartments and associated infrastructure.

Contact Information

Name
Alisa Klaus
Agency Name
University of California
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive/Chinquapin Road
Zip
95064
Total Acres
3
Parcel #
001-011-13
State Highways
Hwy 1, 17, 9
Schools
Westlake ES
Waterways
Jordan Gulch
Township
11S
Range
2W
Base
MDB&M

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print