Nelson Reservoir Improvement Project
2 Documents in Project
Summary
SCH Number
2012041080
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Nelson Reservoir Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
1/23/2013
Present Land Use
Outdoor Teaching and Learning, per the Cal Poly Master Plan
Document Description
CA Polytechnic State University, San Luis Obispo proposes to make repairs to Nelson Reservoir and improve inflow and outflow systems on site. The project will entail lining or compaction of an existing ditch connecting Middlecamp and Nelson Reservoirs, replacement of an inflow culvert, repair of the Nelson Reservoir outfall culvert, installation of a pump platform and sand filtration system, and associated piping. The project will also include rewiring and installation of power poles to connect the reservoir area and Cheda Ranch to the campus power grid. The long-term goal of the project is to provide the proper and safe functioning of Nelson Reservoir and adjoining infrastructure. Ground disturbance will be less than 1 acre, and the project will proceed under permits from USACE, RWQCB, and CDFG.
Contact Information
Name
Joel Neel
Agency Name
California State Polytechnic University, San Luis Obispo
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Stenner Creek Road
Zip
93407
Total Acres
1
Parcel #
73-271-001, 073-341-073
State Highways
Hwy 1
Railways
UPRR
Schools
Cal Poly
Waterways
Stenner Creek, Chorro Creek
Township
30S
Range
12E
Base
MDB&M
Notice of Determination
Approving Agency
The Trustees of the California State University
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes