Encinitas-Solana Beach Coastal Storm Damage Reduction Project

5 Documents in Project

Summary

SCH Number
2012041051
Lead Agency
City of Solana Beach
Document Title
Encinitas-Solana Beach Coastal Storm Damage Reduction Project
Document Type
NOD - Notice of Determination
Received
Posted
2/17/2016
Present Land Use
The project is a proposed coastal storm damage reduction project that would be located on the Public Beach.
Document Description
The Applicant proposes to conduct beach nourishment related activities (sand dredging, placement, and dispersal) to widen area beaches and reduce risks to public safety along two shoreline segments in the Cities of Encinitas and Solana Beach over a fifty year period. These activities are also being conducted to reduce economic damages from wave-induced erosion of coastal bluffs and the beaches along the shoreline segments and to improve recreational opportunities on the widened beaches.

Contact Information

Name
Kathy Weldon
Agency Name
RWQCB - San Diego
Contact Types
Lead/Public Agency

Location

Cities
Encinitas, Solana Beach
Counties
San Diego
Cross Streets
Shorelines and offshore areas comprise the project site.
Zip
92075
Parcel #
Shoreline and offshore
State Highways
Hwy 5 & 101
Railways
NCTD
Airports
No
Schools
several
Waterways
Pacific Ocean, San Dieguito and San Elijo Lagoons

Notice of Determination

Approving Agency
RWQCB - SD Region
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print