Operation of Plant 143 Improvement Project

4 Documents in Project

Summary

SCH Number
2012041036
Lead Agency
East Valley Water District
Document Title
Operation of Plant 143 Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2016
Document Description
SWRCB will be issuing a water supply permit. The East Valley Water District proposed included the construction of two steel water storage tanks with a volume of 4.50 MG, each 179-ft diameter and 24-ft side water depth; and one baffled welded steel break tank with a volume of 1 MG, 84-ft diameter and 24-ft side station that would contain three-2,500 GPM pumps and one-1,500 GPM pump. The proposed project would require an electrical building which would house pumps, power metering, switch gear, motor starters, VFD's control, and other electrical equipment required to facilitate future operations. The proposed project would also include a portable backup power generator in the building for emergencies, estimated to be 400 kW is size. In addition, the proposed project will require modifications to the existing piping and valving. Modifications include disconnection, construction of new pipeline, and additional segments. SWRCB will be issuing a water supply permit for the segment of the project in which construction has been completed; this includes one 1MG storage tank. An additional water supply permit will be required for the remaining of the project upon the completion of construction.

Contact Information

Name
Sean McCarthy
Agency Name
SWRCB
Contact Types
Lead/Public Agency

Location

Cities
Highland, San Bernardino
Counties
San Bernardino
Cross Streets
Merris Street / Church Street / Abbey Way
Zip
92346
State Highways
No
Railways
No
Airports
San Bernardino Int'l
Schools
Yes
Waterways
Santa Ana River
Township
1S
Range
3W
Section
2
Base
SBB&M

Notice of Determination

Approving Agency
SWRCB
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print