McCoy Solar Energy Project
Summary
SCH Number
2012011019
Lead Agency
Riverside County
Document Title
McCoy Solar Energy Project
Document Type
OTH - Other Document
Received
Present Land Use
Vacant/W-2-10 - Controlled Development with a 10 acre minimum/CDCA Plan land use classification of "limited use"
Document Description
Note: Reference SCH# 2011101007
Note: Only Public Review & Comment; No State Agency Review.
AB 900 CEQA Streamlining Application. - For Contact Information - Refer to File.
The proposed McCoy Solar Energy Project (MSEP or Project) would be an up-to 750 megawatt (MW) net alternating current solar power generating installation located in an unincorporated portion of Riverside County. The Project will utilize photovoltaic (PV) technology for the generation of solar energy. The entire 750 MW Project would be comprised of two power units - Unit 1 with a capacity of 250 MW and Unit 2 with a capacity of up to 500 MW. The project would be developed over an area of ~4,315 acres of federal land managed by the Bureau of Land Management (BLM) and 477 acres of private land, plus an ~15.5 mile long transmission line right-of-way.
Contact Information
Name
Agency Name
Contact Types
Lead/Public Agency
Location
Cities
Blythe
Counties
Riverside
Cross Streets
1.5 miles west of Mesa Drive, along Black Rock Road
Zip
92225
Total Acres
4,792
Parcel #
812-130-006; 007-4; 008-5
Airports
Blythe
Township
5S
Range
21E
Section
36
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Other - Public Comments, Other Agency(ies)
State Reviewing Agency Comments
Other - Public Comments, Other Agency(ies)
Development Types
Power:Solar (Megawatts 750)
Local Actions
AB 900
Project Issues
Net zero GHGs
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.