New York Trail East Project (Streambed Alteration Agreement NO. 1600-2016-0219-R2)
5 Documents in Project
Summary
SCH Number
2011102001
Lead Agency
El Dorado County
Document Title
New York Trail East Project (Streambed Alteration Agreement NO. 1600-2016-0219-R2)
Document Type
NOD - Notice of Determination
Received
Posted
5/8/2017
Present Land Use
Open Space; Recreational Facility/One-Family Residential
Document Description
CDFW has executed Streambed Alteration Agreement No. 1600-2016-0219-R2, pursuant to section 1602 of the Fish and Game Code to the project Applicant, the El Dorado County Community Development Agency, as represented by Ms. Donna Keeler.
Project consists of the installation of a 110-foot long, 14-foot wide prefabricated bridge across New York Creek. Bridge abutments will be constructed on both sides of the creek outside of the 100-year floodplain and riparian corridor. The bridge will extend an existing multi-use trail from its current western terminus to Tam O'Shanter Drive, providing access from residential areas east of New York Creek to Stephen Harris Park and to other recreational areas and bike lanes/routes in the area.
Fill material placed around the bridge abutments will extend into the riparian habitat associated with New York Creek, affecting approx. 0.001 acre of habitat. An approx. 02.023 acre corridor of riparian vegetation within the bridge installation area will be removed and/or trimmed by hand in order to allow installation. The construction will result in the removal of five valley oak trees and two willow trees.
Contact Information
Name
Gabriele Quillman
Agency Name
CDFW
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
El Dorado
Cross Streets
North of Tam O'Shanter and Brookline Circle
Zip
95768
Total Acres
9.1
Parcel #
125-100-01, 06
Waterways
New York Creek
Township
10N
Range
8E
Section
26, 27
Base
MDB&M
Other Location Info
City/Nearest Community: El Dorado Hills
Notice of Determination
Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.