Permit No. 19460: Westlands Water District – Lower Yolo Restoration Project
12 Documents in Project
Summary
SCH Number
2011032001
Lead Agency
Westlands Water District
Document Title
Permit No. 19460: Westlands Water District – Lower Yolo Restoration Project
Document Type
NOD - Notice of Determination
Received
Posted
7/27/2020
Document Description
Approval of Permit No. 19460, under California Code of Regulations, Title 23, Article 3, Section 6 for work within an adopted plan of flood control: To restore and enhance approximately 2,128 acres of tidal marsh and riparian habitat within the Yolo Bypass as part of the Lower Yolo Restoration Project (Tidal Marsh Complex Project) by breaching existing perimeter berms; excavating new swales and channels; and removing, relocating, and modifying water control structures, including irrigation pipes and canals, tide gates, pump stations, and culverts. The project would also include placement of excavated and dredged material onto a 109-acre spoil site that will be graded to be no more than 6-inches in depth.
Contact Information
Name
Jennifer Stewart
Agency Name
Central Valley Flood Protection Board
Contact Types
Lead/Public Agency
Phone
Name
Agency Name
Westlands Water District
Contact Types
Project Applicant
Location
Counties
Yolo
Other Location Info
The project is located in the lower Yolo Bypass near Cache Slough, approximately two miles north of the Yolo and Solano County Line.
Notice of Determination
Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
No
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes