Amendment/Extension of Time/Addendum to Conditional Use Permit No. 10-05 (American Kings Solar, LLC), formerly GWF Energy, LLC
3 Documents in Project
Summary
SCH Number
2010101042
Lead Agency
Kings County
Document Title
Amendment/Extension of Time/Addendum to Conditional Use Permit No. 10-05 (American Kings Solar, LLC), formerly GWF Energy, LLC
Document Type
NOD - Notice of Determination
Received
Posted
6/7/2016
Present Land Use
Agricultural Production/Exclusive Agriculture/Agriculture (Exclusive Agriculture)
Document Description
CUP No. 10-05 permits the establishment of a 125 MW photovoltaic solar generation facility on 957 acres of land within the unincorporated area of Kings County. The applicant is proposing an Amendment/Extension of Time/Addendum to CUP No. 10-05, a previously approved photovoltaic solar facility with up to 125 megawatts (MW). The purpose of the Amendment/Extension of Time Addendum is to analyze a revision to the Project's CUP that would; 1) extend the expiration date of CUP No. 10-05 for three years, 2) modify the requirement to mitigate for the loss of Wainson's Hawk foraging habitat based on a project specific analysis, and 3) remove the requirement to cancel the existing Farmland Security Zone contract and allow the Modified Project to demonstrate Farmland Security Zone (FSZ) contract compatibility by maintaining a reasonably foreseeable agricultural operation onsite detemrined by site-specific soil and water analysis, consistent with Kings County Board of Supervisors Resolution No. 13-058. The applicant also seeks modification to the CUP in order to add certain parcels of land to the project site, accommodate an updated project layout, modify certain Project design Features and conditions of approval in response to proposed project revisions, and make other technical changes tot eh project authorized by the CUP.
Contact Information
Name
Jeremy Kinney
Agency Name
Kings County
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lemoore
Counties
Kings
Cross Streets
25th Avenue and SR 198
Zip
93246
Total Acres
957
Parcel #
Several
State Highways
Hwy 198
Waterways
Kings River
Township
19S
Range
19E
Section
27
Base
MDB&M
Notice of Determination
Approving Agency
Kings County Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.