Desert Green Solar Farm Major Use Permit Modification; PDS2012-3301-09-012-01, PDS2012-3910-0905001A
2 Documents in Project
Summary
SCH Number
2010061083
Lead Agency
San Diego County
Document Title
Desert Green Solar Farm Major Use Permit Modification; PDS2012-3301-09-012-01, PDS2012-3910-0905001A
Document Type
NOD - Notice of Determination
Received
Posted
4/2/2013
Present Land Use
The project is subject to the General Plan Regional Policies 1.5 Country Town (CT) and 1.4 Rural Development Area (RDA), Land Use Designations Policy 2.4 Multiple Rural Use (18). The Zoning for the two project parcels is as follows: the 288-Acre Parcel is zoned General Rural (S92), the 54-acre Parcel, Rural Residential (RR 25) parcel), Additionally, the project lies within the influence of the Borrego Valley Airport Land Use Compatibility Plan (ALUCP).
Document Description
The project is a Major Use Permit Modification to an approved (but un-built) solar facility. The proposed modification consists of a reduction in the project footprint and a change in the proposed CPV tracker technology from that approved P09-012. The modified project would include the production of 6.5 MW of power on an ~51 acre development area of the 288 acre site, where the original MUP was approved for development of the entire site.
Contact Information
Name
Ashley Gungle
Agency Name
San Diego County
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Counties
San Diego
Cross Streets
Palm Canyon Drive
Zip
92004
Total Acres
341
Parcel #
141-230-26-00, 141-230-33-00
State Highways
No
Airports
Borrego Springs
Schools
Borrego Springs ES
Waterways
No
Township
10S
Range
06E
Section
35
Base
SBB&M
Other Location Info
City/Nearest Community: Borrego Springs
Notice of Determination
Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.