Cinnamon Ranch Hydroelectric Project, Federal Energy Regulatory Commission Project No. 6885
Summary
SCH Number
2010058113
Public Agency
State Water Resources Control Board
Document Title
Cinnamon Ranch Hydroelectric Project, Federal Energy Regulatory Commission Project No. 6885
Document Type
NOE - Notice of Exemption
Received
Posted
5/13/2010
Document Description
Between May 1 through August 31, the Applicant's project diverts a cumulative or maximum of 8 cubic feet per second (cfs) from the three perennial streams located on USFS and BLM land for power generation. From September 1 through April 30, Applicant diverts 2.5 cfs from Birch Creek for power generation. The facility generates 150 Kilowatts. Water is discharged directly into a regulatory pond located southeast of the powerhouse for irrigation and domestic supply.
Contact Information
Name
Whalen Toy
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency
Phone
Location
Counties
Mono
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15301
Reasons for Exemption
No signinificant effect to the quaiity of the environment was identified in the National Environmental Policy Act review conducted by FERC.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.