Time Critical Removal Action for the Hamilton North Antenna Field, Hamilton Army Airfiled, Novato, California
5 Documents in Project
Summary
SCH Number
2009122079
Lead Agency
Department of Toxic Substances Control
Document Title
Time Critical Removal Action for the Hamilton North Antenna Field, Hamilton Army Airfiled, Novato, California
Document Type
NOD - Notice of Determination
Received
Posted
6/30/2010
Document Description
The Hamilton North Antenna Filed (NAF) is a 270-acre parcel located north of the former Hamilton Army Airfield in Novato, California. The site is owned by the California State Lands Commission and was previously owned and operated by the Army as a rifle range and an antenna field with associated support buildings. The United States Army Corps of Engineers (USACE) Formerly Used Defense Site (FUDS) program is responsible for site remediation of the Hamilton NAF. The Hamilton NAF is planned to eventually be incorporated into the current congressionally authorized Hamilton Wetlands Restoration Project (HWRP). Based on historic sampling results, of the anticipated 90,000 cubic yards of material planned for excavation, at least 25,000 cubic yards will require disposal at an off-site appropriately permitted landfill, and the remaining 65,000 cubic yards may be suitable as a reusable material.
Throughout the proposed project, dust control activities will be implemented in accordance with the Bay Area Air Quality Management District (BBAQMD) CEQA Guidelines.
Contact Information
Name
Paul D. Thayer
Agency Name
California State Lands Commission
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Novato
Counties
Marin
Cross Streets
Perimeter Road
Zip
94949
Total Acres
270
Parcel #
157-180-01; 157-180-25
State Highways
U.S. 101
Schools
Northbay Children's Center and Novato Charter School
Waterways
San Pablo Bay, Novato Creek
Township
3N
Range
6W
Section
14
Base
MBD&M
Notice of Determination
Approving Agency
California State Lands Commission
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.