Poorman Reservoir Maintenance Project
Summary
SCH Number
2009119010
Lead Agency
Fish & Game #6
Document Title
Poorman Reservoir Maintenance Project
Document Type
NOD - Notice of Determination
Received
Posted
11/17/2009
Document Description
SAA#1600-2007-0056-R6 The applicant is proposing to: 1) establish a 100-foot wide permanent fuel management zone along all areas on the perimeter of the reservoir that are adjacent to residential housing, parks, schools, or roads; 2) conduct routing maintenance at all storm drain outfalls within the reservoir, consisting of vegetation and sediment removal to ensure the continuous flow of water, and 3) conduct routine trimming of the lower four to six feet of vegetation in high pedestrian traffic areas to allow visual monitoring of the reservoir.
Contact Information
Name
Ms. Anna Milloy
Agency Name
Department of Fish and Game, Region 6
Contact Types
Lead/Public Agency
Phone
Location
Cities
Moreno Valley
Counties
Riverside
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.