Markeley Lane Extension
3 Documents in Project
Summary
SCH Number
2009112015
Lead Agency
Travis Unified School District
Document Title
Markeley Lane Extension
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2009
Document Description
Travis Unified School District is proposing to construct an ~36 ft wide private roadway with two bicycle lanes and one 6 ft wide sidewalk within a 60 ft wide access easement and a storm water detention basin. The proposed roadway would extend from the inersection of Markeley Lane and De Ronde Drive east and end with a cul-de-sac adjacent to Center School, for a total roadway length of ~1,500 ft. The roadway would involve only minimal grading over most of the length, except for a bridge over the Union Creek Bypass Channel and at the cul-de-sac. The Union Creek Bypass Channel would be spanned with a clear-span concrete bridge that would have fill behind its concrete headwalls, but should not have any jurisdictional impacts to the channel. A temporary stream diversion may be necessary during construction. The eastern end of the cul-de-sac would be excavated ~8 ft into the hillside. An earthen ditch would have maximum excavation and fill of ~4 ft. Overflow from the detention basin would discharge to the nearby Union Creek Bypass Channel. The estimated maximum holding time for water in the detention basin would be 24 to 36 hours.
Contact Information
Name
Ken A. Forrest
Agency Name
Travis Unified School District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Fairfield
Counties
Solano
Cross Streets
Peabody Rd and Air Base Parkway
Total Acres
2.88
Parcel #
174-010-010, 050, 310
Township
5N
Range
1W
Section
15
Notice of Determination
Approving Agency
Travis USD
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.