58th & Pacific Charter School

2 Documents in Project

Summary

SCH Number
2009111019
Lead Agency
City of Huntington Park
Document Title
58th & Pacific Charter School
Document Type
NOD - Notice of Determination
Received
Posted
2/22/2010
Document Description
The project consists of the removal of existing residential and auto dealership uses on the site, and the construction and operation of a charter secondary school for grades 6 through 12 that would provide 560 seats for grades 9 through 12 and 420 seats for grades 6 through 8. Two 2-story classroom buildings would contain a total of 42 classrooms and about 66,000 sf of building area. The project would include a soccer field and a gymnasium building including a basketball court. The project would contain 100 parking spaces at completion. Soil contamination from historic use of the site would be removed in accordance with appropriate federal, state, and local regulations and requirements.

Contact Information

Name
Albert Fontanez
Agency Name
City of Huntington Park
Contact Types
Lead/Public Agency

Location

Cities
Huntington Park
Counties
Los Angeles
Cross Streets
Pacific Blvd at 58th St
Zip
90255
Total Acres
3.1
Parcel #
14 parcels
State Highways
No
Railways
UP, LACMTA
Airports
No
Schools
22 ES, 3 MS, 4 HS
Waterways
Los Angeles River
Township
2S
Range
13W
Section
15
Base
SBB&M

Notice of Determination

Approving Agency
Huntington Park
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print