Mare Island Drydocks Reuse Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2010-009-07-Minor Amendment 4 (ITP)]

11 Documents in Project

Summary

SCH Number
2009072025
Lead Agency
City of Vallejo
Document Title
Mare Island Drydocks Reuse Project [California Endangered Species Act (CESA) Incidental Take Permit No. 2081-2010-009-07-Minor Amendment 4 (ITP)]
Document Type
NOD - Notice of Determination
Received
Posted
1/6/2015
Document Description
The Mare Island Dry Docks Incidental Take Permit (ITP) previously issued involves the establishment and operation of a ship repair/dismantling facility. Activities associated with this project include the rehabilitation and dredging of existing Drydocks 2 and 3 and Berths 11-14. CDFW issued the existing ITP to address and authorize, as fully mitigated, related impacts to Delta smelt (Hypomesus transpacificus), longfin smelt (Spirinchus thaleichthys), winter-run Chinook salmon (Oncorhynchus tshawytscha), and spring-run Chinook salmon (Onchorhynchus tshawytscha), species designated as endangered or threatened under CESA. Minor Amendment No. 4, as approved, modifies the previously issued ITP, to extend the work period until January 5. In approving Minor Amendment No. 4 CDFW determined, among other things, that no substantial increase in the nature or scope of the previous authorization provided by the CESA ITP, and that no significant or substantially more severe environmental impacts that previously considered and disclosed would occur.

Contact Information

Name
Lorie Hammerli
Agency Name
CDFW Bay Delta Region
Contact Types
Lead/Public Agency

Location

Cities
Vallejo
Counties
Solano
Cross Streets
Nimitz St, Bagely St
Zip
94590
Total Acres
16.6
Parcel #
0066-050-100
State Highways
37
Railways
NPRR
Airports
No
Schools
Mare Island ES
Waterways
Napa River, Mare Island/Carquinez Straits

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print