Round Valley Meadow and Stream Headcut Repair and Elevation Restoration

3 Documents in Project

Summary

SCH Number
2009061075
Lead Agency
California Department of Parks and Recreation
Document Title
Round Valley Meadow and Stream Headcut Repair and Elevation Restoration
Document Type
NOD - Notice of Determination
Received
Posted
8/6/2009
Present Land Use
Recreation
Document Description
NOTE: Reference SCH# 2006011099 Restore the hydrology of Round Valley meadow and the natural drainage/elevation pattern of an unnamed stream that is eroding deep into meadow subsoil. The project will temporarily authorize use of mechanized equipment for this project in State Wilderness; use a small backhoe-loader to borrow 700-800 yd3 topsoil and subsoil from about ½ acre upland and depositional sites; restore the eroded stream by placing and stabilizing borrowed material as fill in eroded gully; and restore the natural landscape through re-contouring and native plant revegetation.

Contact Information

Name
Larrynn Carver
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Cities
Palm Springs
Counties
Riverside
Cross Streets
1 Tramway Rd west of SR 111
Zip
92262
Total Acres
<1
Waterways
Unnamed tributary to Long Valley Creek
Township
4S
Range
3E
Section
22
Base
SBB&M
Other Location Info
Mount San Jacinto State Park

Notice of Determination

Approving Agency
CA Department of Parks and Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print