Tuscany Recylced Water Project
Summary
SCH Number
2009061027
Lead Agency
Elsinore Valley Municipal Water District
Document Title
Tuscany Recylced Water Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Z & GP: Tuscany Hills Specific Plan Area
Document Description
NOTE: Review extended to 7/16/09.
The Master Plan describes the components of a recylced water system to serve end users located throughout their Wildomar service area. To be cost-effective, the Master Plan proposed implementation of the system in 4 seperate phases to provide the appropriate level of supply to match demand as it increases over time; this project addresses the Tuscany phase.
The proposed Tuscany Recycle Water Project would deliver 832 acre ft per year (AFY) of recycled water (in lieu of potable water) to converted landscape irrigation users including a park, school fields, medians, slopes and greenbelts. In addition, larger master planned communities (North Tuscany Hills, Ramsgate, Spyglass,and Porto Romano) will connect to the Tuscany system st a later date with projected usage of 1,672 AFY. The total project recycled water usage for this phase is ~2.505 AFY. System facilities will consist of the following: ~38,000 linear ft of 6 inch to 18 inch diameter pipeline; 4,500 gallons per minute pump station (6.48 MGD); 0.8 million gallon reservoir; Turnout facility, which entails a 18 inch diameter high performance butterfly valve at the point of connection tot he existing 54 inch effluent pipeline.
Contact Information
Name
Sudhir Mohleji
Agency Name
Elsinore Valley Municipal Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Lake Elsinore
Counties
Riverside
Cross Streets
Summerhill Dr, Railroad Canyon Rd
Zip
92531
Total Acres
~2.3
Parcel #
363-263-016, -080-038; -670-0
State Highways
I-15
Waterways
San Jacinto River
Township
6S
Range
4W
Section
9,3
Base
SBB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 8 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Santa Ana Region 8 (RWQCB), Department of Fish and Wildlife, Region 6, Department of Water Resources, Resources Agency, State Water Resources Control Board, Division of Water Quality, State Water Resources Control Board, Divison of Financial Assistance
State Reviewing Agency Comments
State Water Resources Control Board, Divison of Financial Assistance
Development Types
Water Facilities (Type recycled water, MGD 832 AFY)
Local Actions
Other
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Growth Inducement, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.