222 Bridge Road, Hillsborough CA - Bank Stabilization Work on an Eroded Section of San Mateo Creek
3 Documents in Project
Summary
SCH Number
2009052078
Lead Agency
City of Hillsborough
Document Title
222 Bridge Road, Hillsborough CA - Bank Stabilization Work on an Eroded Section of San Mateo Creek
Document Type
NOD - Notice of Determination
Received
Posted
8/27/2009
Document Description
Chuck Lebo (Applicant) is proposing to remove a demolished concrete stone wall, stabilize the bank and reestablish the original contours of the bank side slopes on San Mateo Creek on Bridge Road in Hillsborough. Project activities include installation of approximately two tons of rock riprap at the toe of the slope immediately downstream of and adjacent to the cinder block wall for approximately 30-lienar feet. The rock riprap is proposed to be keyed into the bed at a depth of 3-4 feet and would extend to a height of approximately 6-feet above the creek bed. The existing old demolished concrete stonewall is proposed to be removed during the excavation of soil to key in the rock riprap. Native willow cuttings and other native riparian species will be planted between the riprap gaps. Soil will be placed behind the rock toe to recontour the bank to the preexisting 2:1 slope. San Mateo Creek will be diverted around the project site utilizing a piping and pump system as necessary to maintain downstream flows. The California Department of Fish and Game is executing a Lake and Streambed Alteration Agreement Number 1600-2009-0010-3 pursuant to Section 1602 of the Fish and Game code to the project Applicant, Chuck Lebo.
Contact Information
Name
Suzanne DeLeon
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Hillsborough
Counties
San Mateo
Cross Streets
Bridge Rd / Stone Henge
Zip
94010
Total Acres
0.90
Parcel #
032-351-050
State Highways
RTE 92
Schools
South School
Waterways
SM Creek
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.