Raw Water Bypass Pipeline Project
2 Documents in Project
Summary
SCH Number
2009042099
Lead Agency
San Juan Water District
Document Title
Raw Water Bypass Pipeline Project
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
N/A Federal Property
Document Description
SJWD, in partnership with the City of Roseville, is proposing to construct a permanent raw water bypass pipeline to ensure delivery of water from Folsom Reservoir to the San Juan Water District and City of Roseville water treatment plants during planned and unplanned outages of Reclamation's existing 84 inch diameter pipeline. The project would involve construction of a 72 inch diameter raw water bypass pipeline that would extend from the existing pump station (Folsom Pumping Plant) near Folsom Dam to the Hinkle Wye. The project also includes construction of a 60 inch diameter raw water pipeline that would connect the proposed 72 inch pipeline bypass to an existing City of Roseville pipeline along Auburn-Folsom Road.
Contact Information
Name
Keith Durkin
Agency Name
San Juan Water District
Contact Types
Lead/Public Agency
Phone
Location
Cities
Folsom
Counties
Sacramento
Cross Streets
Auburn-Folsom Road and Folsom Dam Road
Zip
95630
Total Acres
5
Waterways
Lower American River and Folsom Reservoir
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Cal Fire, California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), California State Lands Commission (SLC), Central Valley Flood Protection Board, Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Quality, California Department of Transportation, District 3 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 3 (DOT)
Development Types
Water Facilities (new raw water pipeline)(Type RWP, MGD 100)
Local Actions
new pipeline
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildfire
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.