Leon and Benton Roads Recycled Water System

5 Documents in Project

Summary

SCH Number
2009041119
Lead Agency
Eastern Municipal Water District
Document Title
Leon and Benton Roads Recycled Water System
Document Type
NOD - Notice of Determination
Received
Posted
10/26/2009
Document Description
EMWD intends to construct 7,000 gpm recycled water booster station on a portion of APN: 480-170-001 in an unincorporated area of Riverside County adjacent to Leoon Road near the end of the Driftwood Street. EMWD also proposes to construct a 4 MG recycled water storage tank adjacent to EMWD's existing Dutch Village 2.0 mg potable water storage tank on APN: 963-010-008 near the intersection of Benton and Pourroy Roads. In addition, EMWD plans to construct a 24 inch diameter recycled water pipeline to connect the new tank to the existing 24 inch diamter recycled water line in Winchester Road at its intersection with Benton Road. Two alternative pipeline alignments are being considered. One would follow Benton Road from the tank site to its intersection with Winchester Road, and the second would follow Auld Road from the tank site to Van Gaale Lane, thence along Van Gaale to Benton Road and thence along Benton Road to its intersection with Winchester Road.

Contact Information

Name
Karen Hackett
Agency Name
Eastern Municipal Water District
Contact Types
Lead/Public Agency

Location

Cities
Murrieta, Temecula
Counties
Riverside
Cross Streets
Leon Road, Benton Road, Pourroy Road, and Winchester Road
Zip
92596
Parcel #
480-170-001 and 963-010-008
State Highways
79
Airports
French Valley
Schools
Temecula Prep.
Township
6/7S
Range
2W
Section
32/5
Base
SBB&M

Notice of Determination

Approving Agency
EMWD
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print