Water Tank Replacement Project
Summary
SCH Number
2009038272
Public Agency
California Department of Public Health
(CDPH)
Document Title
Water Tank Replacement Project
Document Type
NOE - Notice of Exemption
Received
Posted
3/27/2009
Document Description
The project will consist of 6 phases. Phase 1) Replace redwood tank with a new steel storage tank and piping configuration, Phase 2) the construction of 705 feet of an 8 inch water main within Christy Lane (south) another 755 feet of 8 inch water main within Christy Lane (south), service connections and a new fire hydrant assembly, Phase 3) 2 new pressure reducing valves, a 690 foot 8 inch water main extension, an 8" water line replacement between Washoe Dr. and Apache Way, an 8 inch water line replacement between Sandy Way and the end of Navajo Ct., Phase 4) an 8 inch water main replacement of 1,605 feet on Sand Way (north), service connections, and new fire hydrant assembly, Phase 5) an 8" water main replacement of 2,750 ft. within Lanny Lane, service connections, and new fire hydrant assembly, Phase 6) the rehabilitation of wells No. 1 and No. 2, replacement of equipment and standby power in the well buildings.
Contact Information
Name
Bridget Binning
Agency Name
California Department of Public Health
Contact Types
Lead/Public Agency
Phone
Location
Counties
Placer
Other Location Info
Olympic Valley
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
15302 - Class 2
Reasons for Exemption
The replacement of the storage tank and replacement of water mains meets the criteria for an exemption under Class 2.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.