Bailey Bridges Project

4 Documents in Project

Summary

SCH Number
2009032060
Lead Agency
California Department of Parks and Recreation
Document Title
Bailey Bridges Project
Document Type
NOD - Notice of Determination
Received
Posted
5/13/2009
Document Description
The Department of Parks and Recreation proposes to install annually two summer seasonal Bailey bridges on the South Fork Eel River to provide vehicle access to portions of campgrounds at Richardson Grove State Park and Standish-Hickey State Recreation Area. The bridges can vary in length seasonally to match the dynamic river bar, allowing the river to be spanned without moving material into the summer flow channel. A temporary road would be constructed across the river bar to the bridge location connecting paved access points at each campground. Bridge approach roads would be constructed by heavy equipment moving on-site river gravel. The final graded road surface would be watered and compacted before public use. Bridge abutments would consist of gravel-filled concrete pipes or large boulders back-filled with river gravel. Bridge installation would involve the use of heavy equipment to move and align parts and hand tools to assemble. Bridge segments would be assembled on dry ground, moved into place on rollers, and suspended thereby avoiding disturbance to the summer low flow channel. The bridges and approach roads would be dismantled and removed prior to the onset of winter season flows, and the river bar would be excavated back to original grade, width, and alignment.

Contact Information

Name
John E. Harris
Agency Name
California Department of Parks and Recreation
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Highway 101
Zip
95542
Total Acres
0.97
Parcel #
03326104 & 03326105
State Highways
101
Railways
No
Airports
No
Schools
No
Waterways
South Fork Eel River
Township
5S
Range
3E
Section
13
Other Information
Base: Garberville

Notice of Determination

Approving Agency
CA Dept. of Parks & Recreation
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes