South Lake Tahoe Public Utility District Water Line, Electric Line, and Road Easement
5 Documents in Project
Summary
SCH Number
2009032036
Lead Agency
South Tahoe Public Utility District
Document Title
South Lake Tahoe Public Utility District Water Line, Electric Line, and Road Easement
Document Type
NOD - Notice of Determination
Received
Posted
4/17/2009
Present Land Use
Public Service
Document Description
STPUD maintains an existing water storage tank at a site known as Angora. The tank is in need of replacement and up sizing in order to provide adequate fire flow capacity for the service area. The project proposes replacing the existing 63,000 gallon bolted steel tank with a 249,000 gallon welded steel tank. A new roadway is proposed for access to the tank across two U.S. Forest Service parcels and one California Tahoe Conservancy (CTC) parcel. The proposed roadway stars on the west arm of Aberdeen Circle and travels approximately 630 feet to the tank site. In addition to the tank replacement and access roadway construction, the waterline that provides water to the tank site is proposed for replacement. The water line is located within the CTC parcel and is approximately 800 feet in length.
Contact Information
Name
Julie Ryan
Agency Name
South Tahoe Public Utility District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
South Lake Tahoe
Counties
El Dorado
Cross Streets
Heather Way and Aberdeen Circle
Zip
96150
Total Acres
<1
Parcel #
032-060-13
State Highways
US 50, SR 89
Airports
Lake Tahoe
Schools
South Lake Tahoe HS
Waterways
Fallen Leaf Lake, Upper Truckee River
Township
12N
Range
16E
Section
7
Base
MDB&M
Notice of Determination
Approving Agency
South Tahoe Pubilc Utility District
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.