Permanent Transfer of SWP Table A Water from Dudley Ridge WD to Tulare Lake Basin WSD

2 Documents in Project

Summary

SCH Number
2009031077
Lead Agency
Tulare Lake Basin Water Storage District
Document Title
Permanent Transfer of SWP Table A Water from Dudley Ridge WD to Tulare Lake Basin WSD
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2009
Document Description
The Dudley Ridge Water District (DRWD) and the Tulare Lake Basin Water Storage District (TLBWSD) are agricultural water purveyors with water supply contracts with the California Department of Water Resources (DWR) for surface water supplies from State Water Project (SWP). In 2001 DWR approved Amendment 24 to DRWD's water supply contract and Amendment 26 to TLBWSD's water supply contract, which transferred, on a permanent basis, 3,973 acre-feet (AF) of TLBWSD's annual SWP Table A water to DRWD. The landowner and farming operation (Sandridge Partners) associated with the 2001 transfer desires to permanently transfer the water back from their lands in DRWD to their lands in TLBWSD. The boards of directors of both districts have agreed to support the transfer of the transfer of the SWP Table A water as requested by Sandridge Partners.

Contact Information

Name
Mark Gilkey
Agency Name
Tulare Lake Basin Water Storage District
Contact Types
Lead/Public Agency

Location

Cities
Corcoran
Counties
Kings
Zip
93212

Notice of Determination

Approving Agency
Tulare Lake Basin Water Storage District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print