Moore Rock Quarry

2 Documents in Project

Summary

SCH Number
2009022017
Lead Agency
Humboldt County
Document Title
Moore Rock Quarry
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2009
Document Description
A modification and renewal of Conditional Use/Surface Mining Permits and approval of Reclamation Plan and review of financial assurance cost estimates for continued quarry operations of the Moore Rick Quarry. In 1992, the County permitted re-opening of the historic rock quarry and allowed extraction of up to 10,000 cubic yards every 2 years with a total removal volume of 70,000 cubic yards. Only half of the total volume of rock available has been removed. The current project proposes extraction and crushing of up to 10,000 cubic yards of rock as frequently as annually and will utilize an ~2.45 acres. Mining activties include extraction of rock from the quarry face, crushing and transporting crushed gravel to the stockpile near the road. Extraction is proposed to be accomplished by ripping and breaking up the rock with a bulldozer. In the event that localized graywacke boulders are encountered, small scale seperation with charges will be performed. Vegetation, including 10 trees, will be removed from the west side of the quarry. Equipment also includes crawler tractor, crusher unit, front-end loader and dump truck. The Couty Dept. of Public Works has a License Agreement with the land owner for activities associated with mining, crushing and stockpiling rock. The permit term is 15 yrs and will expire June 8, 2022.

Contact Information

Name
Anita Punla
Agency Name
Community Development Services
Contact Types
Lead/Public Agency

Location

Counties
Humboldt
Cross Streets
Kneeland Rd and Showers Pass Rd
Zip
95549
Total Acres
2.45
Parcel #
314-225-07, 314-242-01
Airports
Kneeland
Township
3N
Range
3E
Section
17,20
Base
HBM
Other Location Info
City/Nearest Community: Kneeland (Moore Rock)

Notice of Determination

Approving Agency
Community Development Service
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print