Bear River North Levee Erosion Sites Repair Project

3 Documents in Project

Summary

SCH Number
2009022011
Lead Agency
Reclamation District 2103
Document Title
Bear River North Levee Erosion Sites Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
3/26/2009
Document Description
The proposed project addressed in this initial study is the repair of three erosion sites along the Bear River North (right bank) Levees (BRNL) near the City of Wheatland, BRNL is operated and maintaned by RD 2103 (or District). The District maintains this and other levees within its service area that border the City of Wheatland and unincorporated land within Sutter, Yuba, and Placer Counties. The District proposes to repair the three erosion sites by reconstructing approximately 1,300 lineal feet along the levee embankment on the river side at two sites and on approximately 100 lineal feet of the levee embankment on the land side at one site to meet the US Army Corps of Engineers (Corps) levee design criteria. Repair of the erosion sites is intended to prevent more erosion and potential levee failure, to meet the safety standards identified in the Corps Levee Design Manual and Technical Letter for Engineering and Design, and to help qualify the levees for Federal Emergency Management Agency (FEMA) 100-year flood protection accreditation for the National Flood Insurance Program (NFIP). A fee of $1,993 was paid in compliance with the California Fish and Game Code 711.4 through the Yuba County Clerk's Office.

Contact Information

Name
Dean Webb
Agency Name
Reclamation District 2103
Contact Types
Lead/Public Agency

Location

Cities
Wheatland
Counties
Placer, Yuba
Total Acres
0.8
State Highways
SR 65
Railways
UPRR
Schools
Wheatland High, Wheatland Elementary
Waterways
Bear River, Feather River, Dry Creek
Township
14/13N
Range
5E
Base
3/9

Notice of Determination

Approving Agency
Board of Directos of Reclamation District 2103
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No