Yucaipa Valley Regional Brineline Extension Project

3 Documents in Project

Summary

SCH Number
2009021105
Lead Agency
Yucaipa Valley Water District
Document Title
Yucaipa Valley Regional Brineline Extension Project
Document Type
NOD - Notice of Determination
Received
Posted
5/11/2009
Document Description
The Proposed Project would extend the existing SARI pipeline by ~14 miles from San Bernardino to the WRWRF to collect waste brine and excess non-potable flow and convey them directly to the ocean for disposal. It would install a reverse-osmosis treatment system within existing developed footprint of the WRWRF. The reverse-osmosis facilities would be enclosed in a pre-manufactured building with a footprint measuring ~80 ft by 225 ft, and would not be more than !25 ft high. Construction of the project would take ~1 to 2 years. A total of 20 workers would be employed at any one time durin construction. Surrounding land uses included undeveloped open space, residential propertyies and recreational commercial properties.

Contact Information

Name
Joseph Zoba
Agency Name
Yucaipa Valley Water District
Contact Types
Lead/Public Agency

Location

Cities
Loma Linda, Redlands, San Bernardino, Yucaipa
Counties
Riverside, San Bernardino
State Highways
I-10, I-215
Railways
BNSF
Airports
SB Int'l, Redlands Municipal
Schools
Several
Waterways
Santa Ana River

Notice of Determination

Approving Agency
Yucaipa Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print