Gilardi Road Bridge Replacement Project

3 Documents in Project

Summary

SCH Number
2009011057
Lead Agency
California State Polytechnic University, San Luis Obispo
Document Title
Gilardi Road Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/16/2009
Document Description
Cal Poly proposes the construction of a new two-lane bridge to replace the existing 23 ft (7 meter) wide, 79 ft (24 meter) long, 4 span timber bridge (#4910006) crossing over Walters Creek (also known as "Gilardi Creek"). Cal Poly will be applying for federal funds through the Highway Bridge Program (HBP), formerly the Highway Bridge Rahabilitation and REplacement Program (HBRRP) administered by the Federal Highway Administration (FHWA). The existing bridge is currently closed to the public.The project applicant proposes to remove the existing bridge by cutting the piers one foot (0.3 m) below streambed elevation. The existing abutments, in order to support the new prefabricated, single span bridge.

Contact Information

Name
Michael Multari
Agency Name
California State Polytechnic University, San Luis Obispo
Contact Types
Lead/Public Agency

Location

Cities
San Luis Obispo
Counties
San Luis Obispo
Cross Streets
Highway 1 and Gilardi Road
Zip
93405
Total Acres
382
Parcel #
073-211-009
State Highways
1
Waterways
Walters Creek (tributary to Chorro Creek)
Township
30S
Range
11E

Notice of Determination

Approving Agency
California Polytechnic State University, San Luis Obispo
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print