Hendon/Heller Special Permit

3 Documents in Project

Summary

SCH Number
2008122094
Lead Agency
Humboldt County
Document Title
Hendon/Heller Special Permit
Document Type
NOD - Notice of Determination
Received
Posted
3/17/2009
Document Description
A Special Permit for culvert replacement and stream restoration on Palmer Creek. The approximately 40 acre parcel is currently developed with a single family residence and several outbuildings. The culvert will be replaced to widen and pave the existing driveway. The proposed replacement culvert will be 40-foot long 7-foot by 5.75 foot corrugated steel pipe arch culvert. All work is proposed to occur during the dry season. Approximately 3.15 cubic yards of cut will occur and approximately 172 cubic yards of fill will be imported to the site. As a second phase to the project, within five year stream restoration will occur along approximately 2,000 linear feet of Palmer Creek. Restoration activities will include, increasing the active flood plain width, installing log and boulder cover structures and increasing the riparian corridor to at least 50 feet by planting native vegetation. This work will be done in conjunction with a Department of Fish and Game grant. Additionally, 500 feet of decking will be added to the existing residence, which is within the stream side management area. This qualifies as "minor development" under the Streamside Management Area Ordinance and no special Permit is required for this activity. No trees are proposed to be removed.

Contact Information

Name
Beth Burks
Agency Name
Community Development Services
Contact Types
Lead/Public Agency

Location

Cities
Blue Lake
Counties
Humboldt
Cross Streets
Hatchery Road/Westend Road
Zip
95525
Total Acres
+/- 34
Parcel #
516-201-01
State Highways
101
Schools
Blue Lake ES
Waterways
Palmer Creek, Mad River, Quarry Creek
Township
5N
Range
1E
Section
25
Base
HB&M

Notice of Determination

Approving Agency
Community Development Services
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print