Route 91 Widening Project

4 Documents in Project

Summary

SCH Number
2008121122
Lead Agency
California Department of Transportation, District 12
Document Title
Route 91 Widening Project
Document Type
NOD - Notice of Determination
Received
Posted
11/2/2010
Document Description
The proposed project consists of improvements to SR-91 in Orange County by adding one general-purpose lane on SR-91 eastbound from the SR-91/SR-55 (PM 9.1) separation to east of the Weir Canyon Road on-ramp (PM 15.0), and on SR-91 westbound from west of the SR-91/SR-241 separation (PM 15.1) to the SR-90/SR-91 separation (Imperial Highway Undercrossing(PM11.1)). The project would relive congestion and improve operational efficiency on SR-91 between SR-55 and west of SR-241. The total length of the project is 6.0 miles. The project will extend existing culverts associated with the roadway widening. A total of 4,400 cubic yards of roadway backfill will be used to fill existing earthen, asphalt and concrete ditches and replace them with .0575 acres of bioswale and/or bioswale and pipe combinations. The path of flow will not change. Measures have been included in Streambed Alteration Agreement 1600-2010-0194-R5, issued by the Department of Fish and Game (DFG), to avoid these potential impacts.

Contact Information

Name
Tim Dillingham
Agency Name
Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Anaheim, Yorba Linda
Counties
Orange

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print