Local Resources Program Agreement with Los Angeles Department of Water and Power for the Terminal Island Recycled Water Expansion Project
4 Documents in Project
Summary
SCH Number
2008121093
Lead Agency
City of Los Angeles
Document Title
Local Resources Program Agreement with Los Angeles Department of Water and Power for the Terminal Island Recycled Water Expansion Project
Document Type
NOD - Notice of Determination
Received
Posted
12/14/2016
Document Description
The LA Dept. of Water and Power is proposing the construction of approx. 60,000 fee (11.4 miles) of 36-inch (or smaller) recycled water pipelines and associated structures in conjunction with the West Basin Municipal Water District. The pipeline would be installed in the ground beneath existing city streets using open trench excavations. The purpose of the project is to replace potable water with treated recycled water for large industrial and commercial customers, allowing the conservation of potable water for residential uses. The proposed pipeline would convey recycled water, treated to CA Dept. of Public Health Title 22 water quality standards and further treated by nitrification processes.
Contact Information
Name
Shilpa Gupta
Agency Name
Metropolitan Water District of Southern CA
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carson
Counties
Los Angeles
Cross Streets
Avalon Boulevard, Pacific Coast Hwy, Wilmington Boulevard, Lomita Boulevard
Zip
90744
State Highways
405,110,47
Railways
BNSF
Airports
No
Schools
Banning, Carson, Wilmington
Waterways
Dominguez Channel
Township
4S
Range
13W
Base
Torrance
Other Location Info
City/Nearest Community: Wilmington
Notice of Determination
Approving Agency
Metropolitan Water District of Southern CA
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.