Boulder Avenue Bridge Replacement Project
5 Documents in Project
Summary
SCH Number
2008121051
Lead Agency
City of Highland
Document Title
Boulder Avenue Bridge Replacement Project
Document Type
NOD - Notice of Determination
Received
Posted
7/29/2011
Document Description
This proposed project involves (1) the replacement of the existing bridge structure to tie into improvements on both ends of the project limits, (2) the raising of the profile of the bridge approaches, (3) the extension of existing culverts located approximately 600 feet and 1,000 feet from the south abutment of the bridge and the extension of the double-cell reinforced concrete box within Bledsoe Creek, (4) the accommodation of a future trails project underneath the new bridge and (5) the reconstruction of SBCFCD access roads and the construction of temporary staging areas.
Contact Information
Name
Kimberly Nicol
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Highland
Counties
San Bernardino
Cross Streets
Boulder Avenue, south of Baseline Street at the City Creek crossing
Zip
92346
State Highways
210 and 330
Railways
No
Airports
San Bernardino International
Waterways
City Creek
Other Information
Schools: Cole ES, San Andreas HS, Cypress ES, Banner ES, Thompson ES, Beattie MS, Highland Frove ES, Arroyo Verde ES
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.