Boulder Avenue Bridge Replacement
5 Documents in Project
Summary
SCH Number
2008121051
Lead Agency
City of Highland
Document Title
Boulder Avenue Bridge Replacement
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2009
Document Description
The proposed Project is the replacement of the existing two-lane Boulder Avenue Bridge with a new four-lane structure, and widens northern and southern approaches to match the existing configuration of Boulder Avenue north and south of the project limit. The proposed Project would also include the construction of street improvements (e.g., curbs, gutters, sidewalks, and decorative lighting); the extension, relocation, and/or modification of drainage features; and the relocation (as necessary) of utility features. In addition to the Bridge Replacement, accommodation for the future extension of a multi-function trail (pedestrian bicycle, and equestrian use) will be incorporated into the project design for possible future connection with the Santa Ana River Trail. At its Hearing on Tuesday, Jan 20, 2009, the Planning Commission found that information set forth in the Initial Study/MND adequately considered and analyzed the potential environmental impacts associated therewith.
Contact Information
Name
Mr. Lawrence Mainez
Agency Name
City of Highland Planning Division
Contact Types
Lead/Public Agency
Phone
Location
Cities
Highland
Counties
San Bernardino
Cross Streets
Boulder Avenue, south of Baseline Street at the City Creek crossing
Zip
92346
State Highways
210 and 330
Railways
No
Airports
San Bernardino International
Waterways
City Creek
Other Information
Schools: Cole ES, San Andreas HS, Cypress ES, Banner ES, Thompson ES, Beattie MS, Highland Frove ES, Arroyo Verde ES
Notice of Determination
Approving Agency
City of Highland
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.