Hospital Road Bridge Project (Streambed Alteration Agreement No. 1600-2016-0022-R4)

5 Documents in Project

Summary

SCH Number
2008121018
Lead Agency
San Benito County
Document Title
Hospital Road Bridge Project (Streambed Alteration Agreement No. 1600-2016-0022-R4)
Document Type
NOD - Notice of Determination
Received
Posted
4/30/2019
Document Description
The California Department of Fish and Wildlife (CDFW) has executed Streambed Alteration Agreement number 1600-2016-0022-R4, pursuant to section 1602 of the Fish and Game Code to the project Applicant, San Benito County Department of Public Works. The Project includes activities related to the construction of a new 580-foot long by 37-foot wide concrete bridge along a new alignment of Hospital Road through the San Benito River, and removal of the existing low water crossing.

Contact Information

Name
Carrie Swanberg
Agency Name
Department of Fish and Wildlife
Contact Types
Lead/Public Agency

Name
Agency Name
County of San Benito
Contact Types
Project Applicant

Location

Counties
San Benito
Other Location Info
The Project will occur in the San Benito River and an unnamed tributary to the San Benito River, on the south side of the City of Hollister at the current and planned new crossing locations at Hospital Road, San Benito County, California; southwest¼ of Section 11, Township 13 South, Range 5 East, USGS 7.5 Minute Quad Map Hollister, MOB & M; Latitude 36°49'00.35"N, Longitude 121 °23'32.24"W.

Notice of Determination

Approving Agency
Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Download CSV New Search Print