Verizon Wireless-Cell Tower
Summary
SCH Number
2008118113
Public Agency
City of Eureka
Document Title
Verizon Wireless-Cell Tower
Document Type
NOE - Notice of Exemption
Received
Posted
11/10/2008
Document Description
Verizon Wireless is requesting a conditional use permit to allow the construction of a 60' tall cell tower that would be stealthed to look like a three legged bell tower. The project would also include a fenced 25' X 40' area for installation of telecommunications equipment, including standby diesel generator with 210 gallon fuel tank and a 12' X 16' equipment building. The surrounding fence would be a 6' tall staggered fence. The exterior of the equipment building shelter will match the style of the existing building to the south and will have a maximum height of 12'; the exterior metal generator will be painted a color to blend with the surrounds.
Contact Information
Name
Kevin R. Hamblin
Agency Name
City of Eureka
Contact Types
Lead/Public Agency
Phone
Location
Cities
Eureka
Counties
Humboldt
Notice of Exemption
Exempt Status
Categorical Exemption
Type, Section or Code
Class 32, Sec 15302
Reasons for Exemption
The Lead Agency has determined that the herein described activity is a project subject to California Environmental Quality Act (CEQA). The Lead Agency has further determined that the project is exempt from CEQA and qualifies for a Class 32 exemption from the preparation of environmental documents. Class 32 exempts in-full development on lots of no more than five acres substantially surrounded by urban uses. Further, the Lead Agency has determined that use of the categorical exemption is not barred by one of the exceptions set forth in Section 15300.2 of the CEQA Guidelines.
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.