San Joaquin River Restoration Stream Gage Installation and Operation/Maintenance

4 Documents in Project

Summary

SCH Number
2008092116
Lead Agency
California Department of Water Resources (DWR)
Document Title
San Joaquin River Restoration Stream Gage Installation and Operation/Maintenance
Document Type
NOD - Notice of Determination
Received
Posted
3/18/2009
Document Description
The resulting settlement form the lawsuit Natural Resources Defense Council, et al., v. Kirk Rodgers, as Regional Director of the United States Bureau of Reclamation, et al. and Orange Cove Irrigation District, et al. requires that restoration flows be measured at six locations on the San Joaquin River from Friant Drive to the confluence of the Merced River Gages at Friant Dam and Gravelly Ford are in place and are not part of this permit process. This project will retrofit two existing gages and install three new stream gages along the San Joaquin River and the Eastside Bypass to ensure compliance of the Settlement. The stream gages will collect data for the restoration floes and water management as required by the Settlement. One stream gage will be retrofitted on the downstream side of the Chowchilla Bifurcation Structure (river mile 213.1), and another downstream from Sack Dam (river mi. 181.1). Two new stream gages will be installed within Reach 4B between Sand Slough and the Mariposa Bypass (approx. river mi. 168-148). The exact locations are to be determined pending landowner agreements. A new gage will also be installed on the San Joaquin River either on the left or right bank approx. one quarter mi. upstream of the confluence of the San Joaquin and Merced Rivers. The exact location will be selected based on availability of site access and other logistical considerations.

Contact Information

Name
Kevin Faulkenberry
Agency Name
California Department of Water Resources
Contact Types
Lead/Public Agency

Location

Cities
Dos Palos
Counties
Fresno, Madera, Merced
State Highways
140
Waterways
San Joaquin River

Notice of Determination

Approving Agency
Department of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.