Batiquitos Gravity Sewer
2 Documents in Project
Summary
SCH Number
2008061087
Lead Agency
Leucadia County Water District
Document Title
Batiquitos Gravity Sewer
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
The project is entirely within the existing right-of-way of Carlsbad Boulevard/North Coast Highway 101 and the Batiquitos Pump Station.
Document Description
The Leucadia Wastewater District proposes to replace an existing 18-inch diameter sewer within a 24-inch diameter PVC gravity sewer line. The project includes all necessary connections to the existing sewer lines and the Batiquitos Pump Station, as well as the restoration of pavement, fencing, and landscaping impacted by construction. The purpose of the project is to increase the reliability and efficiency of the sewer line.
Contact Information
Name
Robin Morishita
Agency Name
Leucadia Wastewater District
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Carlsbad
Counties
San Diego
Cross Streets
Carlsbad Boulevard and La Costa Avenue
Zip
92009
State Highways
I-5
Railways
San Diego Northern
Waterways
Batiquitos Lagoon and Pacific Ocean
Township
12S
Range
4W
Section
33
Base
SBB&M
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, South Coast Region 5 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 11 (DOT), California Highway Patrol, California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Diego Region 9 (RWQCB), Department of Water Resources, Office of Historic Preservation, Resources Agency, Resources, Recycling and Recovery, State Water Resources Control Board, Division of Water Rights, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Waste Treatment:Sewer (24-inch Diameter Gravity Sewer Line)
Local Actions
Coastal Permit, Utility Line
Project Issues
Aesthetics, Air Quality, Biological Resources, Coastal Zone, Cultural Resources, Geology/Soils, Hydrology/Water Quality, Recreation, Transportation, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.