Burris Basin, Lincoln Basin Reconfiguration and Fives Coves Pipeline Project
3 Documents in Project
Summary
SCH Number
2008061079
Lead Agency
Orange County Water District
Document Title
Burris Basin, Lincoln Basin Reconfiguration and Fives Coves Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
1/8/2009
Document Description
The Project proposes the reconfiguration of Burris and Lincoln basins by removing sediment, concrete, and riparian vegetation; constructing a new levee; and constructing of a new transfer pipeline and transfer well. The project will also include the implementation of the Burris Basin Habitat Management Plan, and routine maintenance to the basins. The Burris Basin Habitat Management Plan establishes enviornmental programs to provide for the long term management of biological resources within Burris Basin. The environmental programs include sand bar island creation, non-native tree removal, riparian vegetation restoration, and installation of temporary floating island. Sand bar, island creation will provide long-term management of a sand bar island within the southern portion of Burris Basin. Based on direction from the DFG and the US Fish and Wildlife Service, 2.4 acres of sand bar island will be relocated to the southern end of Burris Basin. Non-native tree removal will extract the stands of non-native trees within Burris Basin. Riparian vegetation restoration will create a native vegetation riparian corridor along the shoreline of Burris Basin. A total of 5.86 acres of native vegetation will be created within Burris Basin. Temporary floating island will be installed to retain the existing bird colonies at Burris Basin during the reconstruction period of the sand bar island by providing a temporary nesting area.
Contact Information
Name
Jeff Humble
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Anaheim
Counties
Orange
Cross Streets
Ball Road at State Route 57 Freeway
Zip
92805
Total Acres
164
Parcel #
374-792-01; 253-271-07; 268-081-02
State Highways
57
Railways
Metro Link
Schools
Elementary School
Waterways
Santa Ana River
Township
4
Range
9,10
Section
13
Notice of Determination
Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.