Operation of Wells No. 27 & 28

2 Documents in Project

Summary

SCH Number
2008061066
Lead Agency
Jurupa Community Services District
Document Title
Operation of Wells No. 27 & 28
Document Type
NOD - Notice of Determination
Received
Posted
4/28/2015
Present Land Use
The proposed project location is within the Jurupa Area Plan (JAP) of the Riverside County Integrated Project General Plan (RCIP GP). The designated land use in the Jurupa Area Plan for the project site and adjacent area is Light Industrial (LI), which allows a variety of industrial and related uses, including warehousing/distribution, assembly and light manufacturing, repair facilities and supporting retail uses developed with a 0.25 to 0.60 floor to area ratio (FAR). The proposed well sites are located on private property (APN Nos. 156-112-010 and 156-030-015). The proposed Galleano Well Site is zoned M-M (Manufacturing - Medium). The proposed Oda Well Site is zoned I-P (Industrial Park). The proposed project pipelines will be constructed within paved roadways.
Document Description
The State Water Resources Control Board (SWRCB), as the responsible agency, will be issuing a water supply permit. The Jurupa Community Services District proposed project is for the operation of Wells No. 27 & 28 and distribution pipeline.

Contact Information

Name
Steve Williams
Agency Name
State Water Resources Control Board
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Oda well: Riverside Dr./Wineville Ave.; Galleano well: 0.5 miles W of Riverside Dr./Etiwanda Ave
Zip
91752
Parcel #
156-112-010 and 156-030-015
State Highways
60, Interstate 15
Railways
Union Pacific
Schools
Jurupa Unified School District
Waterways
Day Creek Flood Control Channel
Township
2S
Range
6W
Section
6 & 8
Base
SBB&M
Other Location Info
City/Nearest Community: Douglass City

Notice of Determination

Approving Agency
State Water Resources Control Board
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print