Infrastructure Improvements, Phase 2

5 Documents in Project

Summary

SCH Number
2008052110
Lead Agency
University of California Santa Cruz
Document Title
Infrastructure Improvements, Phase 2
Document Type
NOD - Notice of Determination
Received
Posted
6/27/2013
Present Land Use
Undeveloped land in drainages / Campus Natural Reserve within developed academic/residential (UCSC 1988 Long Range Development Plan)
Document Description
The project is located on the University of California Campus located within the arboretum at 1156 High Street, within the City of Santa Cruz, County of Santa Cruz, State of California; Assessor Parcel Number (APN): 001-011-13. The Project is limited to the construction of 31 rock step pools, 4 rock sills with roughened channel, 32 log drop/log vane structures, 6 board check dams with base flow notches on Moore Creek and Jordan gulch, and removal of woody and herbaceous vegetation and excavation of sediment from the College 8 Detention Basin to restore functionality. The California Department of Fish and Wildlife is executing a Lake and Streambed Alteration Agreement Number 1600-2013-0099-R3 pursuant to Section 1602 of the Fish and Game Code to the project Applicant, Dean Fitch, University of California Santa Cruz.

Contact Information

Name
Sally Morgan
Agency Name
University of California, Santa Cruz
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
McLaughlin Drive and Hagar Road
Zip
95064
Total Acres
7.6
Parcel #
01-011-13
State Highways
1
Schools
Westlake Elementary
Waterways
San Lorenzo River
Township
11S
Range
2W
Base
MDB&M

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency

Determinations

(1) The project will have a significant impact on the environment
N/A
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A